Fall 1997 - A House For A Low Income Resident
Site Activity
01/30/98
Finishing Touches
12/17/97
Tile
12/15/97
Paint and Clean Up
12/11/97
Interior Paint
12/08/97
Interior Trim
12/04/97
Drywall Tape and Float
12/01/97
Drywall and Brick Continue
11/25/97
Siding Finishes
11/24/97
Siding Progresses
11/21/97
Siding
11/19/97
Inspection and Vapor Barrier
11/18/97
Insulation and Siding
11/10/97
Interior Framing
11/05/97
Plumbing and Electrical
11/03/97
Interior Work Begins
10/30/97
Roofing
10/22/97
Roof Decking
10/20/97
Rafters
10/14/97
Porch and Carport Concrete
10/13/97
Framing Takes Shape
10/10/97
Framing Starts
10/06/97
Slab Preparation
10/03/97
Plumbing
10/01/97
Formwork
09/26/97
Site Preparation
09/24/97
Gound Breaking